Hotline of power engineering specialists:
Grid Connection
3 quarter
Grid connection in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
|
Начальное изменение |
3Q 2021 |
3Q 2022 |
3Q 2023 |
3Q 2024 |
3Q 2025 |
|
Connected capacity, MW |
22,4 |
218,3 |
175,9 |
248,0 |
260,9 |
189,9 |
|
Number of concluded contracts, pcs. |
9,7 |
12 677 |
12 946 |
10 422 |
10 573 |
10 406 |
|
Number of connections, pcs. |
42,7 |
11 273 |
7 689 |
10 522 |
9 575 |
9 626 |
|
including connections up to 15 kW, pcs. |
48,9 |
10 726 |
7 114 |
9 572 |
8 951 |
8 980 |
Connected capacity broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
| MW |
Начальное изменение |
3Q 2021 |
3Q 2022 |
3Q 2023 |
3Q 2024 |
3Q 2025 |
|
Belgorodenergo |
10,4 |
40,3 |
29,9 |
38,9 |
20,9 |
26,0 |
|
Bryanskenergo |
-26,0 |
7,7 |
13,7 |
5,2 |
6,5 |
7,0 |
|
Voronezhenergo |
13,2 |
30,9 |
21,5 |
52,7 |
101,8 |
31,5 |
|
Kostromaenergo |
13,6 |
15,0 |
9,7 |
15,1 |
12,4 |
10,5 |
|
Kurskenergo |
18,6 |
11,5 |
10,6 |
12,5 |
18,9 |
13,3 |
|
Lipetskenergo |
-10,4 |
16,3 |
15,0 |
32,5 |
20,0 |
31,1 |
|
Orelenergo |
-7,4 |
8,7 |
10,6 |
5,9 |
11,1 |
5,9 |
|
Smolenskenergo |
58,9 |
23,2 |
12,3 |
19,4 |
14,9 |
16,4 |
|
Tambovenergo |
451,9 |
14,9 |
9,8 |
8,3 |
8,8 |
8,9 |
|
Tverenergo |
71,3 |
23,3 |
23,7 |
26,8 |
20,0 |
18,7 |
|
Yarenergo |
16,7 |
26,5 |
19,1 |
30,7 |
25,6 |
20,6 |
Number of concluded contracts broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
| pcs. |
Начальное изменение |
3Q 2021 |
3Q 2022 |
3Q 2023 |
3Q 2024 |
3Q 2025 |
|
Belgorodenergo |
31,4 |
2 635 |
1 593 |
1 398 |
1 375 |
1 476 |
|
Bryanskenergo |
10,0 |
515 |
499 |
392 |
328 |
383 |
|
Voronezhenergo |
14,8 |
1 805 |
2 057 |
1 695 |
1 944 |
1 635 |
|
Kostromaenergo |
3,5 |
910 |
1 422 |
795 |
733 |
558 |
|
Kurskenergo |
1,9 |
734 |
937 |
547 |
510 |
913 |
|
Lipetskenergo |
-10,3 |
1 106 |
1 943 |
1 279 |
1 380 |
1 062 |
|
Orelenergo |
-4,1 |
566 |
436 |
405 |
425 |
442 |
|
Smolenskenergo |
10,9 |
1 138 |
1 119 |
813 |
903 |
823 |
|
Tambovenergo |
12,3 |
476 |
272 |
413 |
414 |
429 |
|
Tverenergo |
-10,4 |
1 228 |
1 358 |
1 376 |
1 291 |
1 217 |
|
Yarenergo |
23,1 |
1 284 |
1 355 |
1 309 |
1 270 |
1 468 |
Number of connections broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
| pcs. |
Начальное изменение |
3Q 2021 |
3Q 2022 |
3Q 2023 |
3Q 2024 |
3Q 2025 |
|
Belgorodenergo |
80,9 |
2 426 |
1 261 |
1 594 |
1 296 |
1 424 |
|
Bryanskenergo |
154,5 |
626 |
303 |
353 |
311 |
314 |
|
Voronezhenergo |
72,9 |
1 836 |
685 |
1 527 |
1 837 |
1 515 |
|
Kostromaenergo |
6,0 |
861 |
511 |
831 |
695 |
527 |
|
Kurskenergo |
5,8 |
492 |
591 |
718 |
631 |
783 |
|
Lipetskenergo |
7,3 |
896 |
981 |
1 439 |
1 057 |
1 122 |
|
Orelenergo |
17,5 |
577 |
267 |
361 |
331 |
352 |
|
Smolenskenergo |
34,9 |
877 |
610 |
1 102 |
887 |
835 |
|
Tambovenergo |
383,3 |
290 |
488 |
384 |
415 |
439 |
|
Tverenergo |
2,6 |
924 |
1 072 |
1 043 |
1 057 |
942 |
|
Yarenergo |
41,6 |
1 468 |
920 |
1 170 |
1 058 |
1 373 |
Number of connections up to 15 kW broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
| pcs. |
Начальное изменение |
3Q 2021 |
3Q 2022 |
3Q 2023 |
3Q 2024 |
3Q 2025 |
|
Belgorodenergo |
98,3 |
2 279 |
1 147 |
1 386 |
1 205 |
1 294 |
|
Bryanskenergo |
168,4 |
604 |
274 |
322 |
293 |
300 |
|
Voronezhenergo |
79,1 |
1 782 |
598 |
1 355 |
1 721 |
1 381 |
|
Kostromaenergo |
7,5 |
792 |
472 |
742 |
626 |
468 |
|
Kurskenergo |
10,0 |
473 |
562 |
677 |
607 |
758 |
|
Lipetskenergo |
11,5 |
850 |
940 |
1 338 |
968 |
1 036 |
|
Orelenergo |
18,3 |
562 |
255 |
337 |
315 |
331 |
|
Smolenskenergo |
48,0 |
817 |
562 |
1 037 |
824 |
759 |
|
Tambovenergo |
436,0 |
268 |
451 |
347 |
373 |
401 |
|
Tverenergo |
0,6 |
886 |
1 001 |
963 |
1 019 |
915 |
|
Yarenergo |
49,2 |
1 413 |
852 |
1 068 |
1 000 |
1 337 |
Connected capacity structure by categories of applicants in 2021 – 2025
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
| % |
Начальное изменение |
3Q 2021 |
3Q 2022 |
3Q 2023 |
3Q 2024 |
3Q 2025 |
|
Up to 15 kW |
12,4 |
59,4 |
48,1 |
42,2 |
37,8 |
52,6 |
|
From 15 to 150 kW |
-9,6 |
17,9 |
25,9 |
29,9 |
17,4 |
27,0 |
|
From 150 to 670 kW |
-5,6 |
6,3 |
8,6 |
7,2 |
6,3 |
8,8 |
|
670 kW and above |
2,8 |
16,4 |
17,4 |
20,7 |
38,5 |
11,6 |
Connected capacity structure by categories of applicants in 3Q 2025