Site colours:
Zoom:

IDGC of Centre in the Tambov region provided power supply for a large railway infrastructure facility

15 March 2018

Specialists of IDGC of Centre - Tambovenergo division completed work to increase the previously connected maximum capacity and improve the reliability of power supply for the reconstructed building of the Kirsanov station in the Tambov region.

The reconstruction of the facility, opened in 1871, has been conducted since 2014 to ensure its safe operation in modern conditions and restore the original appearance, for this purpose, more than 340 million rubles have been allocated. To ensure its reliable power supply, the power engineers constructed two sections of the overhead and cable power lines.

At the moment, repair and restoration work is being completed in the building of the station. Its opening is planned for March-April this year.

Back to the list