Residents of the village of Khvorostovo of the Bologovsky district in the Tver region expressed gratitude to specialists of the branch “Rosseti Centre Tverenergo” for the reconstruction of the 0.4 kV electric grid section.
Consumers approached Tverenergo with a request to improve the quality and eliminate power outages in the village.
Based on the results of the inspection of the overhead power line supplying houses in this settlement, it was decided that it was necessary to carry out work on the reconstruction of electric grids of 0.4 kV overhead lines in this section. Tverenergo’s specialists replaced the existing wire with self-supporting insulated wire (SIW) with a length of 900 m.
The self-supporting insulated wire has a number of advantages, allowing to increase the amount and quality of the energy being conducted, being resistant to temperature extremes, while there is no risk of electric shock, as well as the risk of unauthorized connections.
In the letter sent to the Tver branch of Rosseti Centre, the efficiency and competent work of the power engineers was noted: “We express our sincere gratitude for your conscientious attitude to your work and high-quality work!”
“The Tver power engineers of Rosseti Centre continue to make every effort to maintain the operation of the energy facilities in a stable state,” comments Alexander Pilyugin, First Deputy General Director - Chief Engineer of Rosseti Centre - the managing organization of Rosseti Centre and Volga Region. “We are responsible for the reliability of power supply in the Tver region and are ready to immediately respond to every request from consumers.”