The branch “Rosseti Centre Kurskenergo” summed up the activities for the implementation of the 2019 repair program. All measures stipulated by the document were completed in full and on time.

During the reporting period, Kurskenergo’s specialists repaired more than 1,829 km of overhead power lines of 0.4 -110 kV, replaced 14,662 insulators and over 21.5 km of lightning protection cable. To ensure reliable energy supply to consumers, over 908.7 hectares of routes of power lines of various voltage levels were also cleared from tree and shrub vegetation. Equipment was repaired at 321 transformer substations of 10/0.4 kV.

Power engineers carried out repairs of power equipment at 20 large substations, of which the most significant substations supplying district centres and category facilities are the 110/35/10 “Fosforitnaya”, “Glushkovo”, 110/10 kV “Paniki”, “STK”, “Ivnitsa”, 35/10 kV “Nikolskaya”, “Gostomlya”, “Chapaevskaya”, “Kirillovka”, “Pervoavgustovka”, “Starsheye”, “Turovka”, “M. Kamenets”, “Olshanka”, “Blagodat”, “Zaschitnoye”, “Pogozhee”, “Kombikormovaya”, “Kulbaki”, “Ivanino”.

The costs of implementing the full range of works under the 2019 repair program amounted to 250.2 million rubles.

The full and timely implementation of the measures of the repair program significantly contributes to the uninterrupted operation of the branch’s power grid facilities during the heating period of 2019-2020, ensuring high-quality and reliable power supply to consumers in the Kursk region.