Site colours:
Zoom:

IDGC of Centre - Voronezhenergo informs about the restriction of traffic in connection with work on power lines

23.11.2017

IDGC of Centre - Voronezhenergo division informs that in connection with the overhaul of the A-134 highway on the night of 23 November to 24 November 2017, wire and poles of the 10 kV overhead power line, crossing the roadway of this highway at the entrance to the city of Voronezh from the Moscow direction in the area of ​​the Vetryak farm, will be being replaced.

To ensure the safe conduct of work, in agreement with Federal State Institution "Chernozemupravtodor" and the State Traffic Safety Inspectorate of the Ministry of Internal Affairs of the Voronezh Region, from 11:00 pm to 00:00 am on 23 November and from 03:00 am to 04:00 am on 24 November traffic for all types of transport in both directions on the 8th kilometre of the A-134 highway (the area of ​​the Vetryak farm) will be shut down.

Voronezhenergo’s specialists kindly request motorists to take temporary inconveniences with understanding and look in advance for options for entering the city of Voronezh from the direction of Moscow, as well as leaving it bypassing the closed section of the road.

Detailed information on the progress of work can be received by the toll-free 24-hour telephone line of power engineers at 8 800 50 50 115 or 13-50 (from fixed telephones).

Other News

Back to the list