Site colours:
Zoom:

Bryanskenergo is ready to conduct mass work

25.05.2017

A set of preparatory measures has been implemented at IDGC of Centre – Bryanskenergo division, the performance of which is a prerequisite for the commencement of the mass maintenance and repair work envisaged by the 2017 repair program. The commission, consisting of the branch’s managers, checked the production divisions of Bryanskenergo and confirmed their readiness to start the implementation of the main volume of the repair program.

As part of the preparatory measures to prevent accidents in the branch, a set of organizational and technical measures has been implemented, one of which is the updating of lists of potentially dangerous power facilities. Instructions on safety precautions were held with the responsible personnel. During the check, the provision of crews and control centres with the documents necessary for the safe organization and performance of work was confirmed. Workplaces are fully equipped with protective gear, devices, tools and appliances, first-aid kits, overalls. The production units organized "Days with the crew", in which the members of the commission took part.

The set of preparatory measures, implemented by Bryanskenergo in full, will allow timely execution of the repair program and increase the reliability of power supply to consumers in the Bryansk region.

Other News

Back to the list