Hotline of power engineering specialists:
Grid Connection
4 quarter
Grid connection in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Начальное изменение
4Q 2018
4Q 2019
4Q 2020
4Q 2021
4Q 2022
Connected capacity, MW
29,6
325,7
330,8
275,0
273,4
338,5
Number of concluded contracts, pcs.
2,2
11 550
9 314
10 913
11 696
10 232
Number of connections, pcs.
1,1
12 722
11 719
8 731
11 972
14 323
including connections up to 15 kW, pcs.
-2,4
11 609
10 802
7 858
11 175
13 237
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days
10,5
84
73
59
63
81
Connected capacity broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MW
Начальное изменение
4Q 2018
4Q 2019
4Q 2020
4Q 2021
4Q 2022
Belgorodenergo
-5,0
58,5
54,0
51,0
41,2
52,7
Bryanskenergo
12,0
10,3
13,5
5,5
12,6
11,4
Voronezhenergo
57,8
47,8
25,9
67,8
59,9
67,6
Kostromaenergo
49,3
21,8
20,8
12,1
13,5
17,6
Kurskenergo
-5,3
14,2
23,3
24,8
15,6
20,6
Lipetskenergo
139,2
58,6
26,8
14,1
24,7
42,9
Orelenergo
9,4
15,2
20,3
11,0
4,5
7,8
Smolenskenergo
73,8
24,5
55,3
12,3
21,4
19,0
Tambovenergo
76,9
13,8
8,8
4,2
9,0
11,5
Tverenergo
-0,6
32,0
23,1
21,9
32,1
38,1
Yarenergo
3,2
29,0
58,9
50,3
39,1
49,4
Number of concluded contracts broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
4Q 2018
4Q 2019
4Q 2020
4Q 2021
4Q 2022
Belgorodenergo
-8,9
1 816
1 570
1 696
2 081
507
Bryanskenergo
35,8
398
282
375
382
238
Voronezhenergo
-11,0
1 395
1 138
2 062
1 766
1 291
Kostromaenergo
-28,5
1 023
909
785
913
455
Kurskenergo
-4,3
534
571
545
826
543
Lipetskenergo
9,7
804
835
1 013
1 029
805
Orelenergo
22,3
708
500
546
536
247
Smolenskenergo
51,6
1 360
753
876
1 019
457
Tambovenergo
-6,9
378
338
366
497
314
Tverenergo
11,9
1 641
1 333
1 257
1 344
1 056
Yarenergo
8,2
1 493
1 085
1 392
1 303
928
Number of connections broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
4Q 2018
4Q 2019
4Q 2020
4Q 2021
4Q 2022
Belgorodenergo
-9,1
2 268
1 959
1 848
1 935
2 682
Bryanskenergo
33,0
451
420
385
454
587
Voronezhenergo
-29,4
1 257
1 756
1 651
1 730
2 263
Kostromaenergo
10,8
1 298
1 083
531
756
990
Kurskenergo
-7,3
636
633
511
951
607
Lipetskenergo
3,6
1 206
963
627
936
1 937
Orelenergo
29,6
942
770
419
324
388
Smolenskenergo
32,5
1 112
832
572
1 086
1 130
Tambovenergo
-10,2
397
475
96
472
597
Tverenergo
1,2
1 742
1 278
921
1 601
1 336
Yarenergo
16,2
1 413
1 550
1 170
1 727
1 806
Number of connections up to 15 kW broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
4Q 2018
4Q 2019
4Q 2020
4Q 2021
4Q 2022
Belgorodenergo
-14,6
1 966
1 715
1 644
1 754
2 456
Bryanskenergo
31,4
414
373
368
427
552
Voronezhenergo
-32,2
1 167
1 686
1 525
1 637
2 078
Kostromaenergo
4,1
1 170
964
443
675
905
Kurskenergo
-11,8
588
603
469
894
560
Lipetskenergo
0,2
1 072
882
589
876
1 766
Orelenergo
30,1
917
733
405
312
377
Smolenskenergo
27,2
997
735
487
998
1 063
Tambovenergo
-14,7
347
441
70
433
554
Tverenergo
1,1
1 692
1 233
875
1 553
1 246
Yarenergo
14,0
1 279
1 437
983
1 616
1 680
Connected capacity structure by categories of applicants in 2018 – 2022
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
%
Начальное изменение
4Q 2018
4Q 2019
4Q 2020
4Q 2021
4Q 2022
Up to 15 kW
-11,5
39,3
36,3
32,5
48,2
44,7
From 15 to 150 kW
8,0
22,3
18,4
21,7
20,6
22,8
From 150 to 670 kW
-3,5
9,8
9,4
11,2
6,5
7,9
670 kW and above
7,0
28,6
35,9
34,6
24,7
24,6
Connected capacity structure by categories of applicants in 4Q 2022