Hotline of power engineering specialists:
Grid Connection
1 quarter
Grid connection in 2019 – 2023
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Начальное изменение
1Q 2019
1Q 2020
1Q 2021
1Q 2022
1Q 2023
Connected capacity, MW
-29,3
107,1
419,3
173,2
215,7
304,5
Number of concluded contracts, pcs.
-8,5
7 099
6 933
8 915
9 863
7 145
Number of connections, pcs.
-21,3
5 870
6 945
7 218
8 922
14 770
including connections up to 15 kW, pcs.
-21,7
5 489
6 356
6 664
8 350
13 978
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days
27,6
97
66
62
64
82
Connected capacity broken down by Branches in 2019 – 2023
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MW
Начальное изменение
1Q 2019
1Q 2020
1Q 2021
1Q 2022
1Q 2023
Belgorodenergo
-41,5
18,9
24,2
28,1
27,6
31,0
Bryanskenergo
-60,6
2,8
18,3
10,2
4,3
6,2
Voronezhenergo
-47,8
9,7
282,5
24,9
52,7
51,3
Kostromaenergo
-21,5
10,6
14,2
9,6
18,2
17,9
Kurskenergo
-5,1
7,4
6,7
3,4
12,4
20,8
Lipetskenergo
-50,4
6,4
6,1
11,4
15,6
82,0
Orelenergo
-34,2
7,7
7,2
6,8
6,9
11,9
Smolenskenergo
-3,6
10,6
19,6
25,6
18,7
19,1
Tambovenergo
52,4
6,4
7,7
3,9
10,9
15,3
Tverenergo
-22,2
11,9
14,4
16,1
26,2
23,6
Yarenergo
-14,7
14,5
18,4
33,1
22,2
25,6
Number of concluded contracts broken down by Branches in 2019 – 2023
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
1Q 2019
1Q 2020
1Q 2021
1Q 2022
1Q 2023
Belgorodenergo
-5,2
1 101
1 147
1 528
1 539
821
Bryanskenergo
-27,5
243
220
283
344
324
Voronezhenergo
-6,6
940
835
1 350
1 592
1 191
Kostromaenergo
-19,5
646
783
664
774
569
Kurskenergo
-20,9
315
376
564
589
407
Lipetskenergo
-8,1
590
523
685
1 004
875
Orelenergo
-46,2
293
359
312
433
241
Smolenskenergo
-5,6
702
592
772
971
539
Tambovenergo
15,4
285
298
289
316
288
Tverenergo
7,9
979
896
1 454
1 219
858
Yarenergo
3,6
1 005
904
1 014
1 082
1 032
Number of connections broken down by Branches in 2019 – 2023
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
1Q 2019
1Q 2020
1Q 2021
1Q 2022
1Q 2023
Belgorodenergo
-11,6
1 030
1 074
1 392
1 275
1 748
Bryanskenergo
-1,9
255
235
371
345
487
Voronezhenergo
-42,8
602
1 028
1 468
1 279
2 858
Kostromaenergo
-32,9
640
841
524
786
1 056
Kurskenergo
-23,1
283
425
256
577
901
Lipetskenergo
-23,9
360
458
792
863
2 050
Orelenergo
-1,0
503
343
307
379
824
Smolenskenergo
12,0
652
531
748
997
1 219
Tambovenergo
6,1
245
272
110
353
642
Tverenergo
-22,4
691
855
572
1 028
1 500
Yarenergo
-37,4
609
883
678
1 040
1 485
Number of connections up to 15 kW broken down by Branches in 2019 – 2023
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
1Q 2019
1Q 2020
1Q 2021
1Q 2022
1Q 2023
Belgorodenergo
-9,0
945
930
1 242
1 161
1 604
Bryanskenergo
-0,8
242
214
345
337
470
Voronezhenergo
-41,3
586
971
1 395
1 195
2 653
Kostromaenergo
-38,9
552
753
466
688
986
Kurskenergo
-24,1
271
397
250
545
859
Lipetskenergo
-21,3
332
434
758
812
1 962
Orelenergo
-2,4
489
324
297
368
810
Smolenskenergo
13,8
609
460
670
927
1 161
Tambovenergo
5,0
232
239
78
330
609
Tverenergo
-22,0
672
823
526
999
1 456
Yarenergo
-39,8
559
811
637
988
1 408
Connected capacity structure by categories of applicants in 2019 – 2023
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
%
Начальное изменение
1Q 2019
1Q 2020
1Q 2021
1Q 2022
1Q 2023
Up to 15 kW
5,2
56,1
16,8
44,4
46,2
53,1
From 15 to 150 kW
8,4
25,5
10,6
25,1
20,5
18,6
From 150 to 670 kW
-5,8
5,8
2,7
6,7
5,9
4,6
670 kW and above
-7,8
12,6
69,9
23,8
27,4
23,7
Connected capacity structure by categories of applicants in 1Q 2023