Hotline of power engineering specialists:
Grid Connection
3 quarter
Grid connection in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Начальное изменение
3Q 2018
3Q 2019
3Q 2020
3Q 2021
3Q 2022
Connected capacity, MW
-10,7
195.2
233.4
178.3
218,3
175,9
Number of concluded contracts, pcs.
4,7
12 557
11 103
1 558
12 677
12 946
Number of connections, pcs.
-8,6
10 475
11 506
7 900
11 273
7 689
including connections up to 15 kW, pcs.
-10,7
9 827
10 768
7 203
10 726
7 114
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days
-21,7
83
83
67
76
67
Connected capacity broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MW
Начальное изменение
3Q 2018
3Q 2019
3Q 2020
3Q 2021
3Q 2022
Belgorodenergo
-17,5
40.5
43.6
36.5
40,3
29,9
Bryanskenergo
32,2
7.8
12.9
10.4
7,7
13,7
Voronezhenergo
-49,2
21.4
30.7
27.3
30,9
21,5
Kostromaenergo
-2,3
17.3
18.6
13.2
15,0
9,7
Kurskenergo
6,1
10.4
11.8
9.7
11,5
10,6
Lipetskenergo
-19,7
15.9
17.0
18.2
16,3
15,0
Orelenergo
67,1
12.2
11.6
9.4
8,7
10,6
Smolenskenergo
-11,4
15.5
17.9
14.6
23,2
12,3
Tambovenergo
14,3
8.8
9.5
2.7
14,9
9,8
Tverenergo
31,7
21.6
25.0
13.6
23,3
23,7
Yarenergo
-6,7
23.8
34.9
22.7
26,5
19,2
Number of concluded contracts broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
3Q 2018
3Q 2019
3Q 2020
3Q 2021
3Q 2022
Belgorodenergo
-3,8
2 051
1 842
2 005
2 635
1 593
Bryanskenergo
37,5
389
322
468
515
499
Voronezhenergo
-2,6
1 437
1 378
1 572
1 805
2 057
Kostromaenergo
-10,6
1 034
952
879
910
1 422
Kurskenergo
5,3
657
567
720
734
937
Lipetskenergo
2,9
1 030
1 016
1 233
1 106
1 943
Orelenergo
59,8
967
664
590
566
436
Smolenskenergo
15,6
1 250
816
1 026
1 138
1 119
Tambovenergo
13,5
470
457
424
476
272
Tverenergo
-3,3
1 560
1 645
1 371
1 228
1 358
Yarenergo
-3,7
1 492
1 513
758
1 284
1 355
Number of connections broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
3Q 2018
3Q 2019
3Q 2020
3Q 2021
3Q 2022
Belgorodenergo
-30,6
1 866
1 848
1 341
2 426
1 261
Bryanskenergo
13,7
315
336
246
626
303
Voronezhenergo
-24,7
1 021
1 461
1 062
1 836
685
Kostromaenergo
-18,2
1 139
1 136
812
861
511
Kurskenergo
1,8
504
605
465
492
591
Lipetskenergo
-5,1
972
902
835
896
981
Orelenergo
54,1
627
643
491
577
267
Smolenskenergo
3,5
947
867
650
877
610
Tambovenergo
16,0
376
427
60
290
488
Tverenergo
22,2
1 408
1 427
901
924
1 072
Yarenergo
-9,5
1 300
1 854
1 037
1 468
920
Number of connections up to 15 kW broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs.
Начальное изменение
3Q 2018
3Q 2019
3Q 2020
3Q 2021
3Q 2022
Belgorodenergo
-34,2
1 691
1 660
1 149
2 279
1 147
Bryanskenergo
13,3
298
309
225
604
274
Voronezhenergo
-25,6
973
1 398
995
1 782
598
Kostromaenergo
-21,6
1 046
1 047
737
792
472
Kurskenergo
-0,2
471
573
430
473
562
Lipetskenergo
-8,6
901
852
762
850
940
Orelenergo
53,0
606
626
475
562
255
Smolenskenergo
2,0
885
769
552
817
562
Tambovenergo
16,4
355
392
50
268
451
Tverenergo
20,1
1 367
1 387
881
886
1 001
Yarenergo
-9,7
1 234
1 755
947
1 413
852
Connected capacity structure by categories of applicants in 2018 – 2022
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
%
Начальное изменение
3Q 2018
3Q 2019
3Q 2020
3Q 2021
3Q 2022
Up to 15 kW
1,9
57.1
52.4
47.0
59,4
48,1
From 15 to 150 kW
9,8
19.9
21.9
27.5
17,9
25,9
From 150 to 670 kW
-0,5
9.7
9.8
11.9
6,3
8,6
670 kW and above
-11,2
13.3
15.9
13.6
16,4
17,4
Connected capacity structure by categories of applicants in 3Q 2022