Smolenskenergo summed up its investment program for the 1st half 2012

27.09.2012

IDGC of Centre — Smolenskenergo division for the first half of 2012 exceeded the planned investment program. Capital investments of the branch into power grid facilities in the region with the planned indicator 292.8 million rubles in 1H 2012 amounted to 438 million rubles (150%).

On retooling and reconstruction of power facilities the branch spent 327.5 million rubles, about 110.6 million rubles invested in the construction of new facilities, and investments in construction and reconstruction of power lines of 0.4-10 kV, 35 kV totalled 213.8 million rubles.

19.4 million rubles were spent on the construction and reconstruction of 35-110 kV, transformer and distribution substations for 1H 2012. 106.512 km of power lines of different voltage levels were commissioned, the commissioned power for the period was 9.786 MW. Fences at several substations with a length of 1.660 km were also renovated.

Within the grid connection program the costs for the construction and reconstruction of overhead lines of 0.4 to 10 kV and transformer substations were 127.6 million rubles, of which 102.7 million rubles were spent on grid connection of individuals and entities up to 15 kW.

In 1H 2012, 52.3 million rubles were invested into the automated information and measuring system of commercial metering.

Within the preparation program for the celebration of the 1150th anniversary of the city of Smolensk in the reporting period, the reconstruction of 6 kV cable line of transformer substation 21 of an equestrian school in the settlement of Odintsovo, construction of 10/0.4 kV transformer substation; 0.4 kV overhead line; 10 kV (State Archives of Smolensk region) substation Chernushki in Smolensk.

As part of the program implementation to bring ROWs to the regulatory state 57.22 hectares were cleared for the period.

The investment program is aimed at providing reliable and quality electricity supply in the region, reducing the wear and tear of equipment of IDGC of Centre — Smolenskenergo division.