Operating results

Annual indicators

Electrical energy transmission in 2015–2019

Graph
Начальное изменение 9M 2015 9M 2016 9M 2017 9M 2018 9M 2019
Supply to the grid, Billion kW*h 0.2 45.5 46.3 44.4 39.4 38.8
Productive supply1, Billion kW*h 0.0 41.6 42.3 40.4 35.5 35.0
Total losses, Billion kW*h 2.6 3.9 4.0 4.0 3.9 3.8
Total losses, % 0.15 п.п. 8.57 8.57 8.99 9.84 9.89
Total losses (in comparable conditions2), % -0.13 п.п. 10.74 10.62 10.37 10.06 9.89
Electricity transmission services3, Billion kW*h 1.8 40.3 41.1 39.2 34.6 34.1
Electricity transmission services (in comparable conditions2), Billion kW*h 1.8 33.4 34.0 34.4 34.6 34.1
1 — productive supply within the joint operation (taking into account losses of TGOs)
2 — in the context of the composition of electric grid assets in 2018 (termination of the “last mile” agreements from 01.07.2017, as well as the integration of networks of the city of Nelidovo from 01.04.2018, were taken into account)
3 — taking into account the volume of services for the transmission of electrical energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Electrical energy supply to the grid broken down by Branches in 2015-2019

Graph
Billion kW*h Начальное изменение 9M 2015 9M 2016 9M 2017 9M 2018 9M 2019
Belgorodenergo 0.0 8.9 9.1 8.1 5.5 5.2
Bryanskenergo -3.4 2.8 2.7 2.8 2.7 2.7
Voronezhenergo 1.6 6.4 6.5 6.6 6.8 6.7
Kostromaenergo 0.0 2.0 2.0 2.0 2.0 2.0
Kurskenergo 0.0 4.3 4.5 3.9 2.6 2.6
Lipetskenergo 0.0 5.5 5.6 5.1 4.0 3.8
Orelenergo 0.0 1.8 1.8 1.8 1.8 1.8
Smolenskenergo -3.6 2.7 2.8 2.9 2.9 2.8
Tambovenergo -4.3 2.2 2.3 2.3 2.1 2.2
Tverenergo 0.0 3.9 4.0 4.1 4.1 4.0
Yarenergo 2.1 4.9 5.0 4.9 4.9 4.9

Electrical energy of productive supply1 broken down by Branches in 2015-2019

Graph
Billion kW*h Начальное изменение 9M 2015 9M 2016 9M 2017 9M 2018 9M 2019
Belgorodenergo 0.0 8.4 8.6 7.5 5.0 4.7
Bryanskenergo -3.7 2.6 2.6 2.6 2.6 2.6
Voronezhenergo 1.7 5.9 6.0 6.0 6.2 6.2
Kostromaenergo 0.0 1.7 1.7 1.8 1.8 1.8
Kurskenergo 0.0 4.0 4.2 3.6 2.3 2.3
Lipetskenergo 0.0 5.0 5.2 4.7 3.6 3.4
Orelenergo 0.0 1.6 1.6 1.6 1.6 1.6
Smolenskenergo 0.0 2.4 2.5 2.5 2.6 2.5
Tambovenergo 0.0 2.1 2.1 2.1 2.0 2.0
Tverenergo 0.0 3.4 3.4 3.4 3.4 3.4
Yarenergo -2.2 4.4 4.5 4.5 4.4 4.4
1 — productive supply within the joint operation (taking into account losses of TGOs)

Electrical energy of total losses broken down by Branches in 2015-2019

Graph
% Начальное изменение 9M 2015 9M 2016 9M 2017 9M 2018 9M 2019
Belgorodenergo 0.02 6.10 6.09 6.72 9.47 9.47
Bryanskenergo 0.30 5.19 5.17 5.16 5.60 4.99
Voronezhenergo -0.06 8.27 8.48 8.64 8.33 7.99
Kostromaenergo -0.27 12.13 12.02 11.28 10.72 10.96
Kurskenergo 0.33 7.53 7.05 7.98 11.83 11.32
Lipetskenergo -0.20 7.99 7.44 8.39 9.63 11.18
Orelenergo -0.91 9.92 10.17 10.19 9.95 8.73
Smolenskenergo -0.01 12.50 12.13 12.49 11.36 12.01
Tambovenergo -0.24 6.71 6.55 6.06 6.84 7.09
Tverenergo -0.73 13.99 15.10 15.94 16.22 15.51
Yarenergo 2.44 9.41 9.55 8.95 8.56 9.27

Volume of electrical energy transmission services2 in 2015-2019

Graph
bln kW/h Начальное изменение 9M 2015 9M 2016 9M 2017 9M 2018 9M 2019
Belgorodenergo 0.0 8.4 8.6 7.5 5.0 4.8
Bryanskenergo 18.2 2.6 2.6 2.6 2.6 2.6
Voronezhenergo 0.0 5.5 5.7 5.7 5.9 5.9
Kostromaenergo 0.0 1.7 1.7 1.8 1.8 1.8
Kurskenergo 0.0 3.9 4.0 3.4 2.2 2.2
Lipetskenergo 0.0 4.9 5.0 4.5 3.4 3.3
Orelenergo 0.0 1.5 1.5 1.6 1.6 1.6
Smolenskenergo 0.0 2.4 2.4 2.5 2.6 2.5
Tambovenergo -5.0 1.9 2.0 2.0 2.0 2.0
Tverenergo 3.3 3.1 3.2 3.3 3.3 3.3
Yarenergo 2.4 4.3 4.4 4.3 4.2 4.2
2 - Taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Electrical energy transmission by voltage levels broken down by Branches for 9 months 2019


bln kWh Supply to the grid
Productive supply
Total
Productive supply
HV
Productive supply
MV1
Productive supply
MV2
Productive supply
LV
Total losses
Total losses
(%)
Belgorodenergo 5.2 4.7 1.1 0.3 1.6 1.7 0.5 9.47
Bryanskenergo 2.7 2.6 1.8 0.3 0.2 0.2 0.1 4.99
Voronezhenergo 6.7 6.2 4.3 0.3 0.6 0.9 0.5 7.99
Kostromaenergo 2.0 1.8 0.7 0.0 0.4 0.6 0.2 10.96
Kurskenergo 2.6 2.3 1.3 0.2 0.3 0.5 0.3 11.32
Lipetskenergo 3.8 3.4 2.2 0.1 0.5 0.6 0.4 11.18
Orelenergo 1.8 1.6 1.1 0.1 0.2 0.2 0.2 8.73
Smolenskenergo 2.8 2.5 1.2 0.1 0.5 0.8 0.3 12.01
Tambovenergo 2.2 2.0 1.0 0.2 0.4 0.4 0.2 7.09
Tverenergo 4.0 3.4 1.6 0.7 0.5 0.6 0.6 15.51
Yarenergo 4.9 4.4 2.4 0.3 0.8 0.9 0.5 9.27
TOTAL for Rosseti Centre 38.8 35.0 18.9 2.6 6.1 7.4 3.8 9.89

Grid Connection

Grid connection in 2015-2019

Graph
Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Connected capacity, MW 1.6 772.2 713.1 614.5 541.8 509.5
Number of concluded contracts, pcs. -3.7 37 359 37 019 33 315 32 413 29 217
Number of connections, pcs. 25.9 44 959 32 460 29 733 27 262 26 344
including connections up to 15 kW, pcs. 27.1 43 500 31 002 28 461 25 540 24 654
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days - - - 106 83 83

Connected capacity broken down by Branches in 2015-2019

Graph
MW Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Belgorodenergo -29.4 140.8 119.5 124.9 110.9 94.6
Bryanskenergo 9.1 27.5 25.5 18.1 22.1 22.9
Voronezhenergo 33.0 137.1 83.3 99.2 56.2 58.5
Kostromaenergo 25.2 49.7 47.9 43.3 48.8 40.5
Kurskenergo -8.8 40.4 40.7 27.4 35.1 27.3
Lipetskenergo -35.3 45.7 62.4 81.4 46.1 38.6
Orelenergo 57.9 53.2 40.9 22.3 32.5 28.7
Smolenskenergo 11.7 67.8 75.3 53.6 40.0 42.9
Tambovenergo -26.2 21.7 36.9 34.9 21.9 27.2
Tverenergo 14.8 106.1 79.0 49.0 56.0 56.6
Yarenergo 33.4 82.2 101.7 60.4 72.2 71.7

Number of concluded contracts broken down by Branches in 2015-2019

Graph
pcs. Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Belgorodenergo -11.5 8 562 7 722 6 541 5 606 4 781
Bryanskenergo -2.2 943 953 791 1 185 885
Voronezhenergo -15.0 3 846 3 822 3 829 3 679 3 639
Kostromaenergo 14.6 3 731 3 400 3 496 2 831 2 646
Kurskenergo -28.4 1 847 1 989 1 751 1 769 1 424
Lipetskenergo -17.6 3 172 2 853 2 901 2 717 2 571
Orelenergo 12.8 2 212 1 941 1 639 2 206 1 660
Smolenskenergo 12.6 3 192 3 267 2 811 3 157 2 365
Tambovenergo 3.0 1 200 1 149 1 076 1 149 1 276
Tverenergo 3.4 4 413 5 067 4 372 3 940 4 008
Yarenergo 14.4 4 241 4 856 4 108 4 174 3 962

Number of connections broken down by Branches in 2015-2019

Graph
pcs. Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Belgorodenergo -5.9 8 422 6 787 6 481 4 743 4 474
Bryanskenergo 18.9 863 860 1 093 994 916
Voronezhenergo 132.8 7 781 3 240 3 612 2 877 3 016
Kostromaenergo 16.3 3 204 3 243 3 283 3 543 2 520
Kurskenergo 8.4 2 110 1 654 1 449 1 436 1 438
Lipetskenergo 5.6 3 641 2 667 2 462 2 165 2 105
Orelenergo 84.8 3 432 1 753 1 466 1 749 1 803
Smolenskenergo 7.3 3 142 3 364 2 525 2 274 2 185
Tambovenergo -9.4 988 972 865 896 1 077
Tverenergo 35.6 7 185 4 790 3 072 3 269 3 308
Yarenergo 24.8 4 191 3 130 3 425 3 316 3 502

Number of connections up to 15 kW broken down by Branches in 2015-2019

Graph
pcs. Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Belgorodenergo -5.1 8 095 6 472 6 160 4 272 4 044
Bryanskenergo 19.8 798 809 1 059 934 863
Voronezhenergo 138.8 7 619 3 040 3 472 2 723 2 902
Kostromaenergo 16.9 3 017 3 083 3 122 3 321 2 303
Kurskenergo 9.0 2 045 1 555 1 385 1 361 1 377
Lipetskenergo 7.0 3 559 2 567 2 328 1 991 1 978
Orelenergo 86.0 3 376 1 709 1 427 1 704 1 755
Smolenskenergo 7.1 2 942 3 234 2 407 2 119 1 964
Tambovenergo -6.9 927 904 804 839 999
Tverenergo 36.3 7 100 4 720 3 023 3 168 3 213
Yarenergo 22.3 4 022 2 909 3 274 3 108 3 256

Connected capacity structure by categories of applicants in 2015-2019

Graph
% Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Up to 15 kW 13.83 п.п. 59.48 45.64 49.77 52.66 53.80
From 15 to 150 kW -0.4 п.п. 8.14 9.12 10.38 18.40 22.98
From 150 to 670 kW -1.14 п.п. 13.66 16.43 11.16 11.54 8.66
670 kW and above -12.29 п.п. 18.72 28.81 28.69 17.40 14.56

Productive potential

Productive potential indicators1 in 2019

Graph
Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Length of 0.4-110 kV Conductors (along ROW), km 0.7 381 217 384 464 386 043 377 556 374 506
- Length of 35-110 kV Conductors (along ROW), km 0.1 52 019 51 979 51 983 51 729 51 289
- Length of 0.4-10 kV Conductors (along ROW), km 0.8 329 198 332 485 334 060 325 827 323 217
Length of 0.4-110 kV Cables, km 18.9 16 800 17 613 18 377 19 890 20 625
Capacity of Substations, MVA 2.8 53 199 54 172 54 392 54 376 54 226
Number of Substations, pcs 2.1 99 705 101 587 102 559 103 046 103 244
- Capacity of 35-110 kV Substations, MVA 0.6 33 978 34 372 34 324 34 380 34 400
- Number of 35-110 kV Substations, pcs 0.3 2 366 2 372 2 366 2 369 2 377
- Capacity of 6-10/0.4 kV Transformer and Distribution Substations, MVA 6.9 19 221 19 800 20 068 19 995 19 826
- Number of 6-10/0.4 kV Transformer and Distribution Substations, pcs 2.2 97 339 99 215 100 193 100 677 100 867
Number of c.u. 2.8 1 725 800 1 750 655 2 319 998 2 307 445 2 421 449
Number of Distribution Zones, pc. 0.4 279 279 277 277 274
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Length of 35-110 kV Conductors (along ROW)1 broken down by Branches in 2019

Graph
km Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo 0.0 4 360 4 360 4 360 4 367 4 307
Bryanskenergo 0.4 3 558 3 543 3 543 3 543 3 552
Voronezhenergo 0.2 6 806 6 807 6 807 6 805 6 806
Kostromaenergo 0.0 4 305 4 303 4 310 4 204 4 184
Kurskenergo 0.0 4 733 4 727 4 727 4 727 4 644
Lipetskenergo 0.0 3 885 3 885 3 885 3 838 3 811
Orelenergo -0.1 3 097 3 098 3 098 3 079 3 086
Smolenskenergo 0.0 6 316 6 316 6 317 6 319 6 052
Tambovenergo 0.0 4 956 4 959 4 959 4 867 4 880
Tverenergo 0.0 6 866 6 846 6 831 6 835 6 840
Yarenergo 0.0 3 136 3 136 3 146 3 146 3 127
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Length of 0.4-10 kV Conductors (along ROW)1 broken down by Branches in 2019

Graph
km Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo -88.8 4 360 39 489 39 733 36 588 37 334
Bryanskenergo -83.5 3 558 21 705 21 824 21 790 22 264
Voronezhenergo -84.7 6 806 45 295 45 350 45 484 43 905
Kostromaenergo -78.0 4 305 19 406 18 993 17 893 18 119
Kurskenergo -84.7 4 733 31 709 32 228 32 385 29 340
Lipetskenergo -85.7 3 885 27 580 27 501 24 677 24 910
Orelenergo -87.7 3 097 25 163 25 255 22 941 23 262
Smolenskenergo -80.3 6 316 32 578 32 813 32 879 33 073
Tambovenergo -77.3 4 956 22 163 22 276 22 548 22 676
Tverenergo -83.1 6 866 41 192 41 577 41 865 42 049
Yarenergo -86.9 3 136 26 204 26 510 26 777 26 285
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Length of 0.4-110 kV1 Cables broken down by Branches in 2019

Graph
km Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo 4.0 7 775 8 143 8 438 9 551 10 076
Bryanskenergo 2.0 139 139 144 144 146
Voronezhenergo 5.8 272 336 348 367 401
Kostromaenergo 0.5 1 515 1 539 1 545 1 637 1 666
Kurskenergo 0.6 300 310 337 336 298
Lipetskenergo 11.1 912 940 1 046 1 180 1 235
Orelenergo -45.3 146 165 171 105 140
Smolenskenergo 1.4 2 109 2 138 2 149 2 156 2 209
Tambovenergo 14.5 198 255 290 316 323
Tverenergo -14.4 539 705 858 908 931
Yarenergo 499.4 2 895 2 944 3 051 3 190 3 201
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Capacity of 35-110 kV1 Substations broken down by Branches in 2019

Graph
MVA Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo 2.1 3 509 3 604 3 554 3 594 3 595
Bryanskenergo 5.2 2 487 2 528 2 492 2 477 2 440
Voronezhenergo 2.0 4 810 4 970 5 027 4 998 4 994
Kostromaenergo 0.0 1 758 1 782 1 782 1 782 1 780
Kurskenergo -0.2 3 476 3 485 3 479 3 479 3 477
Lipetskenergo -1.3 2 948 2 978 3 022 3 038 3 038
Orelenergo 0.3 1 825 1 825 1 825 1 881 1 911
Smolenskenergo 0.0 3 069 3 049 3 062 3 062 3 114
Tambovenergo 0.9 2 545 2 577 2 573 2 571 2 591
Tverenergo 0.1 4 339 4 354 4 271 4 263 4 212
Yarenergo 0.5 3 212 3 221 3 236 3 236 3 248
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Number of 35-110 kV1 Substations broken down by Branches in 2019

Graph
pcs. Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo 1.7 180 181 180 181 181
Bryanskenergo 2.1 148 146 145 145 143
Voronezhenergo -0.3 294 298 298 298 296
Kostromaenergo 0.0 165 165 165 165 165
Kurskenergo 0.0 286 286 285 285 285
Lipetskenergo 0.0 200 201 201 201 201
Orelenergo 0.0 142 143 143 144 147
Smolenskenergo 0.0 252 252 252 252 253
Tambovenergo 0.0 208 209 209 209 221
Tverenergo 0.0 316 316 313 314 313
Yarenergo 0.6 175 175 175 175 172
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Capacity of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2019

Graph
MVA Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo -3.2 3 839 4 033 4 111 4 201 4 258
Bryanskenergo 0.6 764 768 784 780 776
Voronezhenergo 1.4 1 749 1 808 1 848 1 872 1 849
Kostromaenergo 2.6 1 524 1 546 1 530 1 545 1 545
Kurskenergo 0.4 1 751 1 785 1 793 1 816 1 654
Lipetskenergo 5.6 1 685 1 693 1 695 1 686 1 709
Orelenergo -4.9 874 889 890 697 922
Smolenskenergo 3.7 1 873 1 908 1 903 1 903 1 940
Tambovenergo 1.5 1 114 1 168 1 183 1 160 1 170
Tverenergo -1.2 1 762 1 876 1 969 1 941 1 951
Yarenergo 108.3 2 288 2 326 2 362 2 394 2 051
1 – data presented with taking into account rent, lease and equipment serviced under contracts

Number of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2019

Graph
pcs. Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo 1.0 12 784 13 117 13 293 13 423 13 571
Bryanskenergo 1.2 5 774 5 815 5 927 5 884 5 958
Voronezhenergo 1.3 11 752 12 003 12 075 12 225 12 096
Kostromaenergo 0.2 6 422 6 453 6 422 6 464 6 497
Kurskenergo 0.4 9 789 10 034 10 122 10 198 9 408
Lipetskenergo 4.9 9 272 9 302 9 353 9 317 9 379
Orelenergo -0.2 6 066 6 084 6 114 5 825 5 902
Smolenskenergo 0.9 9 396 9 524 9 562 9 593 9 790
Tambovenergo 1.4 6 135 6 195 6 235 6 266 6 363
Tverenergo -0.1 11 648 12 110 12 301 12 492 12 563
Yarenergo 15.3 8 301 8 578 8 789 8 990 9 340
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Number of c.u.1 broken down by Branches in 2019

Graph
у.е. Начальное изменение 30.09.2015 30.09.2016 30.09.2017 30.09.2018 30.09.2019
Belgorodenergo 2.3 304 571 311 925 360 615 344 822 362 137
Bryanskenergo 1.3 96 022 95 821 132 225 132 468 163 521
Voronezhenergo 1.1 184 925 190 139 256 314 269 908 279 977
Kostromaenergo 0.3 109 997 110 226 139 172 151 994 161 509
Kurskenergo 0.3 162 270 164 269 225 877 190 972 206 724
Lipetskenergo 1.3 135 959 137 400 184 069 179 959 184 258
Orelenergo -0.8 96 053 96 530 133 469 127 720 141 280
Smolenskenergo 0.3 182 372 182 932 297 600 286 979 294 541
Tambovenergo 0.6 104 631 105 788 141 415 142 034 145 754
Tverenergo -1.3 180 541 184 723 225 755 241 192 241 441
Yarenergo 27.8 168 458 170 901 223 488 239 398 240 306
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Level of physical deterioration of equipment1 в 2019 г.

Graph
Name of equipment Начальное изменение 01.01.2019 31.03.2019 30.06.2019 30.09.2019
Conductors 0.4-20 kV, % none 71.73 71.86 71.88 71.66
Conductors 35-110 kV, % none 81.85 81.98 82.16 82.36
Conductors 0.4-110 kV % none 74.39 74.50 74.56 74.44
Cables 0.4-20 kV, % none 65.95 66.18 66.39 66.42
Cables 35-110 kV, % none 32.65 33.35 35.46 36.40
Cables 0.4-110 kV, % none 59.58 61.12 60.74 61.06
Power lines 35-110 kV, % none 77.10 77.06 77.06 77.28
Power lines 3-20 kV, % none 71.94 72.21 72.26 72.07
Power lines 0.4 kV, % none 70.09 69.80 69.78 69.45
Transformer equipment 35-110 kV, % none 83.75 84.24 84.43 84.58
Transformer equipment 3-110 kV, % none 80.56 80.83 80.93 81.01
Switching devices 35-110 kV, % none 72.13 72.37 72.71 73.02
Switching devices 3-110 kV, % none 70.39 70.47 70.78 71.08
Substation equipment 35-110 kV, % none 77.35 77.65 77.93 78.16
Substation equipment 3-110 kV, % none 76.50 76.48 76.68 76.87
Total wear of Rosseti Centre, % none 70.39 70.47 70.78 71.08
1 - data presented with taking into account rent, lease and equipment serviced under contracts

Reliability indicators of power supply to consumers in 2015-2019

Graph
Начальное изменение 9M '15 9M '16 9M '17 9M '18 9M '19
Number of technological violations in the grid 110 kV, pc. -17.2 1 054 1 164 1 074 916 721
Specific failure rate in the grid 6 kV and above, pc. per 1,000 pieces of equipment -24.0 6.09 5.14 4.27 3.87 3.19
System Average Interruption Duration Index (SAIDI), hour 47.0 4.91 4.43 3.65 2.72 1.19
(SAIDI), hour, corrected to all 2019 (12 months) 47.0 4.91 4.43 3.65 2.72 1.59
System Average Interruption Frequency Index (SAIFI), pc. 1.4 2.12 1.96 1.49 1.31 0.81
(SAIFI), hour, corrected to all 2019 (12 months) 1.4 2.12 1.96 1.49 1.31 1.08

Repair program

Actual performance of the repair program in 2015-2019

Graph
Item # Indicator UOM Начальное изменение 9M' 15 9M' 16 9M' 17 9M' 18 9M' 19
1 Main equipment repair
1.1 35-110 kV PL km -22.7 5 679.0 4 304.7 4 453.4 4 541.9 4 127.1
1.2 0.4-10 kV PL km -14.1 12 472.5 11 866.1 10 990.6 10 487.3 10 268.0
1.3 6-10/0.4 kV TS pc -9.6 4 559.0 4 758.0 4 845.0 4 331.0 4 536.0
2 ROW clearing
2.1 35-110 kV Conductors ha -3.7 5 787.5 4 199.6 4 812.4 5 221.4 6 756.8
2.2 0.4-10 kV Conductors ha -13.7 7 848.7 5 542.0 6 661.3 6 064.0 5 903.1
3 Costs
3.1 Total cost million RUR 7.0 1 824.2 1 802.9 1 913.2 2 158.6 2 440.9
3.2 35-110 kV PL million RUR 8.0 222.1 234.5 257.6 130.6 328.0
3.3 35-110 kV SS million RUR -9.6 299.2 291.5 301.7 329.0 326.0
3.4 0.4-10 kV networks million RUR 8.9 940.9 928.5 992.0 955.7 1 316.8
3.5 ROW clearing 0.4-110 kV PL million RUR -2.2 210.6 200.6 261.6 355.1 339.1
3.6 Other million RUR 69.3 151.4 147.9 100.2 388.1 131.0

Forecast of performance of the repair program of IDGC of Centre for 4Q 2019


Item # Indicator UOM Outlook, 4Q 2019
1 Main equipment repair
1.1 35-110 kV PL km 0.0
1.2 0.4-10 kV PL km 0.0
1.3 6-10/0.4 kV TS pc 0
2 ROW clearing
2.1 35-110 kV Conductors ha 0.0
2.2 0.4-10 kV Conductors ha 0.0
3 Costs
3.1 Total cost million RUR 46.4
3.2 35-110 kV PL million RUR 0.0
3.3 35-110 kV SS million RUR 0.0
3.4 0.4-10 kV networks million RUR 0.0
3.5 ROW clearing 0.4-110 kV PL million RUR 0.0
3.6 Other million RUR 4.8