Operating results

Electrical energy transmission

Electrical energy transmission in 2016-2020

Graph
Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Supply to the grid, Billion kW*h -3.9% 17.8 14.8 14.8 14.3 14,3
Productive supply1, Billion kW*h -4.4% 15.7 13.0 12.9 12.7 12,8
Total losses, Billion kW*h 0.0% 2.0 1.9 1.9 1.6 1,5
Total losses, % 0.12 11.40 12.48 12.63 11.14 10,64
Total losses (in comparable conditions2), % -0.10 13.62 12.64 12.70 11.14 10,64
Productive supply3, Billion kW*h -2.0% 15.1 12.5 12.4 12.3 12,3
Electricity transmission services (in comparable conditions2), Billion kW*h - 12.7 12.5 12.4 12.3 12,3
1 — productive supply within the joint operation (taking into account losses of TGOs)
2 — In the context of the composition of electric grid assets in 2018 (termination of the “last mile” agreements from 01.07.2017, as well as the integration of networks of the city of Nelidovo from 01.04.2018, were taken into account)
3 — Taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Supply to the grid broken down by Branches in 2016-2020

Graph
bln kWh Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo 0.0 3.4 2.1 2.0 1.9 1,9
Bryanskenergo 0.0 1.1 1.1 1.1 1.0 1,0
Voronezhenergo -4.0 2.5 2.5 2.5 2.5 2,5
Kostromaenergo -12.5 0.8 0.7 0.8 0.7 0,7
Kurskenergo 0.0 1.7 1.0 1.0 1.0 1,0
Lipetskenergo -4.8 2.1 1.5 1.4 1.5 1,5
Orelenergo 0.0 0.7 0.7 0.7 0.7 0,6
Smolenskenergo 0.0 1.1 1.1 1.1 1.1 1,1
Tambovenergo 0.0 0.9 0.8 0.8 0.8 0,8
Tverenergo -6.3 1.6 1.5 1.6 1.5 1,5
Yarenergo 0.0 1.9 1.8 1.8 1.9 1,8

Productive supply1 broken down by Branches in 2016-2020

Graph
bln kWh Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo 0.0 3.1 1.8 1.8 1.7 1,6
Bryanskenergo 0.0 1.0 1.0 1.0 0.9 0,9
Voronezhenergo 0.0 2.3 2.2 2.3 2.3 2,3
Kostromaenergo 0.0 0.6 0.6 0.6 0.6 0,6
Kurskenergo 7.1 1.5 0.8 0.8 0.9 0,8
Lipetskenergo -5.6 1.9 1.3 1.2 1.3 1,3
Orelenergo 0.0 0.6 0.6 0.6 0.6 0,6
Smolenskenergo 0.0 0.9 1.9 1.0 0.9 0,9
Tambovenergo 0.0 0.8 0.7 0.7 0.7 0,7
Tverenergo 0.0 1.3 1.3 1.3 1.2 1,3
Yarenergo 0.0 1.7 1.6 1.6 1.6 1,6
1 - Productive supply within the boiler (including losses of TGOs)

Total losses broken down by Branches in 2016-2020

Graph
% Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo -0.35 8.28 12.16 12.33 11.73 11,72
Bryanskenergo -0.01 6.87 6.55 6.83 4.83 6,05
Voronezhenergo 0.0 11.22 10.50 9.98 9.06 8,31
Kostromaenergo -0.07 15.81 13.39 14.56 12.34 12,23
Kurskenergo -0.25 9.94 14.63 13.78 10.99 11,90
Lipetskenergo 0.43 11.81 13.12 14.41 12.41 10,23
Orelenergo 0.12 12.27 10.98 10.89 10.77 9,46
Smolenskenergo -1.17 16.62 14.84 15.28 14.79 13,16
Tambovenergo -0.06 8.23 8.97 9.51 6.78 9,79
Tverenergo 0.10 17.24 18.41 17.89 15.67 14,80
Yarenergo 3.67 11.96 12.55 13.08 11.57 10,19

Volume of electrical energy transmission services2 broken down by Branches 2016-2020

Graph
bln kWh Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo 0.0 3.1 1.8 1.8 1.7 1,7
Bryanskenergo 0.0 1.0 1.0 1.0 0.9 0,9
Voronezhenergo 0.0 2.1 2.1 2.1 2.1 2,2
Kostromaenergo 0.0 0.6 0.6 0.6 0.6 0,6
Kurskenergo 0.0 1.5 0.8 0.8 0.8 0,8
Lipetskenergo -5.9 1.8 1.3 1.1 1.2 1,2
Orelenergo -16.7 0.6 0.6 0.6 0.5 0,5
Smolenskenergo 111.1 0.9 0.9 0.9 0.9 0,9
Tambovenergo 0.0 0.8 0.7 0.7 0.7 0,7
Tverenergo -7.7 1.2 1.2 1.2 1.2 1,2
Yarenergo 0.0 1.6 1.5 1.5 1.6 1,5
2 - Taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
High voltage (110 kV и выше) -0.7 47,8% 43,0% 36,8% 36,0% 33,2%
Medium voltage (35 kV) 0.0 3,9% 4,2% 4,6% 4,4% 4,2%
Medium voltage (10-6 kV) 0.1 18,7% 20,7% 23,3% 23,8% 25,3%
Low voltage (0,4 kV) -0.1 7,9% 8,5% 9,3% 9,4% 9,9%
Population 1 0.6 21,7% 23,6% 26,1% 26,3% 27,4%
1Taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 4Q 2020

Grid Connection

Grid connection in 2016-2020

Graph
Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Connected capacity, MW 2.2 364.8 251.3 325.7 330.8 275,0
Number of concluded contracts, pcs. -7.8 11 390 11 304 11 550 9 314 10 913
Number of connections, pcs. 25.6 13 713 12 581 12 722 11 719 8 731
including connections up to 15 kW, pcs. 25.8 12 968 11 890 11 609 10 802 7 858
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days - - 76 84 73 59

Connected capacity broken down by Branches in 2016-2020

Graph
MW Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo -17.7 56.3 61.6 58.5 54.0 51,0
Bryanskenergo -9.3 31.3 9.2 10.3 13.5 5,5
Voronezhenergo -11.6 89.2 30.2 47.8 25.9 67,8
Kostromaenergo -27.2 16.5 14.6 21.8 20.8 12,1
Kurskenergo 132.1 12.2 15,0 14.2 23.3 24,8
Lipetskenergo -9.1 29.7 24.5 58.6 26.8 14,1
Orelenergo 17.3 24.0 13.9 15.2 20.3 11,0
Smolenskenergo -0.7 21.5 14.1 24.5 55.3 12,3
Tambovenergo -30.1 19.0 7.8 13.8 8.8 4,2
Tverenergo 19.8 27.0 32.2 32.0 23.1 21,9
Yarenergo 60.8 38.0 28.1 29.0 58.9 50,3

Number of concluded contracts broken down by Branches in 2016-2020

Graph
pcs. Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo -17.6 2 080 1 993 1 816 1 570 1 696
Bryanskenergo -9.3 540 293 398 282 375
Voronezhenergo -21.9 1 378 1 568 1 395 1 138 2 062
Kostromaenergo 8.9 1 300 1 430 1 023 909 785
Kurskenergo -53.2 549 558 534 571 545
Lipetskenergo -10.5 866 733 804 835 1 013
Orelenergo -6.4 694 579 708 500 546
Smolenskenergo -2.5 916 897 1 360 753 876
Tambovenergo -11.3 329 406 378 338 366
Tverenergo 17.9 1 505 1 467 1 641 1 333 1 257
Yarenergo 25.1 1 233 1 380 1 493 1 085 1 392

Number of connections broken down by Branches in 2016-2020

Graph
pcs. Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo -19.5 2 767 2 495 2 268 1 959 1 848
Bryanskenergo 39.5 349 339 451 420 385
Voronezhenergo 86.1 1 849 1 781 1 257 1 756 1 651
Kostromaenergo 33.3 1 374 1 171 1 298 1 083 531
Kurskenergo 121.2 799 686 636 633 511
Lipetskenergo -8.1 1 016 1 164 1 206 963 627
Orelenergo 35.8 680 727 942 770 419
Smolenskenergo 21.3 1 105 839 1 112 832 572
Tambovenergo 62.9 388 442 397 475 96
Tverenergo 38.5 1 570 1 721 1 742 1 278 921
Yarenergo 39.7 1 816 1 216 1 413 1 550 1 170

Number of connections up to 15 kW broken down by Branches in 2016-2020

Graph
pcs. Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Belgorodenergo -21.3 2 617 2 301 1 966 1 715 1 644
Bryanskenergo 49.8 318 315 414 373 368
Voronezhenergo 90.1 1 732 1 722 1 167 1 686 1 525
Kostromaenergo 34.0 1 319 1 124 1 170 964 443
Kurskenergo 121.9 768 667 588 603 469
Lipetskenergo -8.3 936 1 070 1 072 882 589
Orelenergo 37.7 650 705 917 733 405
Smolenskenergo 21.5 1 041 784 997 735 487
Tambovenergo 70.2 356 407 347 441 70
Tverenergo 38.9 1 520 1 673 1 692 1 233 875
Yarenergo 38.5 1 711 1 122 1 279 1 437 983

Connected capacity structure by categories of applicants in 2016-2020

Graph
% Начальное изменение 4Q 2016 4Q 2017 4Q 2018 4Q 2019 4Q 2020
Up to 15 kW -4.0 п.п. 38,3% 50,8% 39,3% 36,3% 32,5%
From 15 to 150 kW 1.3 п.п. 9,0% 14,3% 22,3% 18,4% 21,7%
From 150 to 670 kW 3.0 п.п. 13,4% 13,3% 9,8% 9,4% 11,2%
670 kW and above -0.2 п.п. 39,3% 21,7% 28,6% 35,9% 34,6%

Connected capacity structure by categories of applicants in 4Q 2020