Operating results

Electrical energy transmission

Electrical energy transmission in 2018 – 2022

Graph
Billion kW*h Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Supply to the grid -18.2 12.1 12.0 11.8 12.2 12.3
Productive supply1 -19.6 11.1 11.0 10.8 11.3 11.3
Total losses -9.1 1.0 1.0 1.0 1.0 1.0
Total losses, % 0.83 8.12 8.02 8.73 7.84 8.15
Electricity transmission services2 -18.7 10.9 10.8 10.5 11.1 11.1
1 — productive supply within the joint operation (taking into account losses of TGOs)
2 — Taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Electrical energy supply to the grid broken down by Branches in 2018 – 2022

Graph
Billion kW*h Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -43.3 1.7 1.6 1.6 1.6 1.6
Bryanskenergo -11.1 0.8 0.8 0.8 0.8 0.8
Voronezhenergo 0.0 2.1 2.1 2.1 2.2 2.2
Kostromaenergo 0.0 0.6 0.6 0.6 0.6 0.6
Kurskenergo -42.9 0.8 0.8 0.8 0.8 0.8
Lipetskenergo -33.3 1.2 1.2 1.2 1.3 1.3
Orelenergo 0.0 0.6 0.5 0.6 0.6 0.6
Smolenskenergo 0.0 0.9 0.9 0.8 0.9 0.9
Tambovenergo 0.0 0.7 0.7 0.7 0.7 0.7
Tverenergo -7.7 1.2 1.2 1.2 1.2 1.3
Yarenergo -6.3 1.5 1.5 1.4 1.5 1.5

Electrical energy of productive supply1 broken down by Branches in 2018 – 2022

Graph
Billion kW*h Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -42.9 1,6 1.5 1.5 1.5 1.5
Bryanskenergo 0.0 0.8 0.8 0.8 0.8 0.8
Voronezhenergo 0.0 1.9 2.0 1.9 2.1 2.1
Kostromaenergo 0.0 0.6 0.6 0.5 0.6 0.6
Kurskenergo -50.0 0.7 0.7 0.7 0.7 0.8
Lipetskenergo -35.3 1.1 1.1 1.1 1.2 1.1
Orelenergo 0.0 0.5 0.5 0.5 0.5 0.5
Smolenskenergo 0.0 0.8 0.8 0.7 0.8 0.8
Tambovenergo -14.3 0.6 0.6 0.6 0.6 0.6
Tverenergo 0.0 1.1 1.1 1.0 1.1 1.1
Yarenergo 0.0 1.4 1.4 1.3 1.4 1.5
1 — productive supply within the joint operation (taking into account losses of TGOs)

Electrical energy of total losses broken down by Branches in 2018 – 2022

Graph
% Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo 3.10 7.85 8.14 7.36 7.86 7.69
Bryanskenergo 0.11 4.56 3.98 4.93 4.58 4.54
Voronezhenergo -0.42 6.99 6.73 7.53 6.57 6.53
Kostromaenergo -0.55 9.47 9.37 7,46 5.59 6.86
Kurskenergo 4.19 9.84 9.37 10.76 9.34 9.54
Lipetskenergo 0.91 7.23 8.41 9.31 8.61 11.65
Orelenergo -0.52 8.56 7.17 8.61 7.27 7.28
Smolenskenergo -1.94 8.81 9.57 11.20 10.09 10.38
Tambovenergo 0.51 5.96 6.12 3.69 7.06 7.10
Tverenergo -0.21 14.01 12.81 14.16 11.07 12.23
Yarenergo -0.84 6.79 6.75 9.26 7.50 5.83

Volume of electrical energy transmission services2 broken down by Branches 2018 – 2022

Graph
bln kW/h Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -42.9 1.6 1.5 1.5 1.5 1.5
Bryanskenergo 0.0 0.8 0.8 0.8 0.8 0.8
Voronezhenergo 5.6 1.9 1.9 1.8 2.0 2.0
Kostromaenergo 0.0 0.6 0.6 0.5 0.6 0.6
Kurskenergo -46.2 0.7 0.7 0.7 0.7 0.7
Lipetskenergo -31.3 1.1 1.1 1.1 1.1 1.1
Orelenergo 0.0 0.5 0.5 0.5 0.5 0.5
Smolenskenergo 0.0 0.8 0.8 0.7 0.8 0.8
Tambovenergo -14.3 0.6 0.6 0.7 0.6 0.7
Tverenergo -9.1 1.0 1.0 1.0 1.1 1.1
Yarenergo -7.1 1.3 1.3 1.2 1.4 1.4
2 - Taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
High voltage (110 kV и выше) -10.7 36.6 35.8 34.0 34.4 32.8
Medium voltage (35 kV) 0.6 4.5 4.4 4.4 4.1 3.9
Medium voltage (10-6 kV) 4.2 23.0 23.6 23.7 23.7 24.3
Low voltage (0,4 kV) 1.5 9.4 9.6 9.3 9.0 9.1
Population 1 4.4 26.5 26.6 28.6 28.8 29.9
1Taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 2Q 2022

Grid Connection

Grid connection in 2018 – 2022

Graph
Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Connected capacity, MW 4.1 195.2 169.0 140.7 156.2 214.2
Number of concluded contracts, pcs. -6.8 12 098 11 015 6 764 11 622 14 043
Number of connections, pcs. -11.0 9 329 8 968 6 637 7 635 8 725
including connections up to 15 kW, pcs. -13.7 8 702 8 397 6 076 7 082 8 145
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days -28.4 83 89 63 58 71

Connected capacity broken down by Branches in 2018 – 2022

Graph
MW Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -7.1 38.0 32.1 23.3 28.2 32.9
Bryanskenergo -21.1 7.1 7.3 3.7 5.7 14.8
Voronezhenergo -4.1 16.2 18.1 21.7 27.8 17.6
Kostromaenergo 27.9 17.9 11.2 11.0 16.0 15.1
Kurskenergo 60.4 17.0 8.1 9.0 8.7 13.0
Lipetskenergo -8.5 17.3 15.2 10.5 15.7 19.0
Orelenergo 3.6 8.6 9.4 5.4 7.9 7.1
Smolenskenergo -35.4 13.5 14.3 13.7 14.7 41.3
Tambovenergo -5.3 8.9 11.3 5.4 2.6 10.7
Tverenergo -0.5 19.1 19.6 15.5 14.9 22.7
Yarenergo 63.2 31.5 22.3 21.6 14.0 20.0

Number of concluded contracts broken down by Branches in 2018 – 2022

Graph
pcs. Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -14.5 2 393 1 838 1 212 2 112 2 417
Bryanskenergo 77.3 461 320 193 496 503
Voronezhenergo -17.3 1 236 1 321 1 025 1 806 1 558
Kostromaenergo -22.0 995 1 048 480 1 017 1 116
Kurskenergo -7.5 714 542 408 713 619
Lipetskenergo -5.9 1 045 965 745 896 1 648
Orelenergo 10.2 694 703 354 533 671
Smolenskenergo 13.7 1 163 847 588 940 1 589
Tambovenergo 6.1 432 534 178 432 427
Tverenergo -11.6 1 473 1 384 823 1 393 2 140
Yarenergo -3.7 1 492 1 513 758 1 284 1 355

Number of connections broken down by Branches in 2018 – 2022

Graph
pcs. Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -29.9 1 712 1 596 1 175 1 316 1 586
Bryanskenergo -15.4 419 325 156 221 286
Voronezhenergo -25.3 803 953 1 131 1 227 822
Kostromaenergo 28.2 1 450 744 623 954 559
Kurskenergo -9.6 564 550 431 436 465
Lipetskenergo -23.0 720 843 556 859 1 243
Orelenergo 13.3 614 657 348 349 318
Smolenskenergo -14.2 745 666 478 759 636
Tambovenergo -8.5 289 405 200 64 580
Tverenergo 5.7 970 1 190 631 723 1 388
Yarenergo -8.3 1 043 1 039 908 727 842

Number of connections up to 15 kW broken down by Branches in 2018 – 2022

Graph
pcs. Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Belgorodenergo -34.1 1 542 1 439 1 038 1 180 1 484
Bryanskenergo -19.2 392 312 147 201 266
Voronezhenergo -27.5 752 918 1 051 1 189 758
Kostromaenergo 27.5 1 372 704 559 889 484
Kurskenergo -12.2 533 533 414 413 426
Lipetskenergo -24.4 668 794 516 798 1 200
Orelenergo 13.7 597 640 334 328 308
Smolenskenergo -16.8 699 586 409 686 571
Tambovenergo -10.8 263 375 178 59 551
Tverenergo 5.0 939 1 154 596 662 1 336
Yarenergo -14.2 945 942 834 677 761

Connected capacity structure by categories of applicants in 2018 – 2022

Graph
% Начальное изменение 2Q 2018 2Q 2019 2Q 2020 2Q 2021 2Q 2022
Up to 15 kW -7.4 50.1 55.0 25.1 54.5 46.0
From 15 to 150 kW 6.0 17.6 23.9 15.3 28.2 19.3
From 150 to 670 kW 4.0 12.6 7.7 4.1 7.6 8.1
670 kW and above -2.6 19.7 13.4 55.5 9.7 26.6

Connected capacity structure by categories of applicants in 2Q 2022