* — the change is calculated on the basis of the indicators presented in the table and rounded to the nearest tenth
Billion kW*h
Начальное изменение
2Q 2018
2Q 2019
2Q 2020
2Q 2021
2Q 2022
Supply to the grid
-18.2
12.1
12.0
11.8
12.2
12.3
Productive supply1
-19.6
11.1
11.0
10.8
11.3
11.3
Total losses
-9.1
1.0
1.0
1.0
1.0
1.0
Total losses, %
0.83
8.12
8.02
8.73
7.84
8.15
Electricity transmission services2
-18.7
10.9
10.8
10.5
11.1
11.1
1 — productive supply within the joint operation (taking into account losses of TGOs) 2 — Taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)
Electrical energy supply to the grid broken down by Branches in 2018 – 2022
* - the change is calculated on rounded to the first decimal place in the table
bln kW/h
Начальное изменение
2Q 2018
2Q 2019
2Q 2020
2Q 2021
2Q 2022
Belgorodenergo
-42.9
1.6
1.5
1.5
1.5
1.5
Bryanskenergo
0.0
0.8
0.8
0.8
0.8
0.8
Voronezhenergo
5.6
1.9
1.9
1.8
2.0
2.0
Kostromaenergo
0.0
0.6
0.6
0.5
0.6
0.6
Kurskenergo
-46.2
0.7
0.7
0.7
0.7
0.7
Lipetskenergo
-31.3
1.1
1.1
1.1
1.1
1.1
Orelenergo
0.0
0.5
0.5
0.5
0.5
0.5
Smolenskenergo
0.0
0.8
0.8
0.7
0.8
0.8
Tambovenergo
-14.3
0.6
0.6
0.7
0.6
0.7
Tverenergo
-9.1
1.0
1.0
1.0
1.1
1.1
Yarenergo
-7.1
1.3
1.3
1.2
1.4
1.4
2 - Taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)
Structure of productive supply by voltage levels (volume of electricity transmission services)
1Taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)
Structure of productive supply by voltage levels in 2Q 2022
* - change calculated with the rounded to the first decimal figures reflected in the table
Начальное изменение
2Q 2018
2Q 2019
2Q 2020
2Q 2021
2Q 2022
Connected capacity, MW
4.1
195.2
169.0
140.7
156.2
214.2
Number of concluded contracts, pcs.
-6.8
12 098
11 015
6 764
11 622
14 043
Number of connections, pcs.
-11.0
9 329
8 968
6 637
7 635
8 725
including connections up to 15 kW, pcs.
-13.7
8 702
8 397
6 076
7 082
8 145
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days
-28.4
83
89
63
58
71
Connected capacity broken down by Branches in 2018 – 2022