Electrical energy transmission

Electrical energy transmission in 2017–2021

Graph
Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Supply to the grid, Billion kW*h 1.2 17.6 15.4 14.8 14.2 15.0
Productive supply1, Billion kW*h 1.3 15.7 13.5 13.0 12.5 13.3
Total losses, Billion kW*h 0.0 1.9 1.9 1.9 1.7 1.7
Total losses, % 0.02 п.п. 10.92 12.56 12.58 11.73 11.61
Total losses (in comparable conditions2), % -0.09п.п. 13.11 12.92 12.77 11.73 11.61
Electricity transmission services3, Billion kW*h 0.7 15.1 13.0 12.5 12.1 12.8
Volume of services for electricity transmission (in comparable conditions2), Billion kW*h 1.6 12.7 13.0 12.5 12.1 12.8
1 — productive supply within the joint operation (taking into account losses of TGOs)
2 — In the context of the composition of electric grid assets in 2018 (termination of the “last mile” agreements from 01.07.2017, as well as the integration of networks of the city of Nelidovo from 01.04.2018, were taken into account)
3 — Taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Electrical energy supply to the grid broken down by Branches in 2017-2021

Graph
Billion kW*h Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo 0.0 3.3 2.0 1.9 1.9 1.9
Bryanskenergo 0.0 1.0 1.1 1.0 1.0 1.0
Voronezhenergo -4.0 2.5 2.6 2.5 2.5 2.6
Kostromaenergo 0.0 0.8 0.8 0.8 0.7 0.8
Kurskenergo 0.0 1.6 1.0 1.0 0.9 1.0
Lipetskenergo 0.0 2.1 1.6 1.5 1.5 1.6
Orelenergo 0.0 0.7 0.7 0.7 0.6 0.6
Smolenskenergo 0.0 1.1 1.1 1.1 1.0 1.1
Tambovenergo 0.0 0.9 0.8 0.8 0.8 0.8
Tverenergo 6.7 1.6 1.6 1.6 1.5 1.6
Yarenergo 5.3 2.0 2.0 1.9 1.8 1.9

Electrical energy of productive supply1 broken down by Branches in 2017-2021

Graph
Billion kW*h Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo 0.0 3.1 1.8 1.7 1.7 1.7
Bryanskenergo 0.0 1.0 1.0 1.0 0.9 0.9
Voronezhenergo 0.0 2.2 2.3 2.3 2.2 2.3
Kostromaenergo 16.7 0.6 0.7 0.7 0.6 0.7
Kurskenergo 7.1 1.5 0.9 0.8 0.8 0.9
Lipetskenergo 5.9 1.9 1.4 1.2 1.3 1.4
Orelenergo 0.0 0.6 0.6 0.6 0.6 0.6
Smolenskenergo 0.0 0.9 1.0 1.0 0.9 1.0
Tambovenergo 0.0 0.8 0.8 0.7 0.7 0.7
Tverenergo 0.0 1.3 1.3 1.3 1.2 1.4
Yarenergo 0.0 1.7 1.8 1.7 1.6 1.7
1 — productive supply within the joint operation (taking into account losses of TGOs)

Electrical energy of total losses broken down by Branches in 2017-2021

Graph
% Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo -0.13 7.83 12.34 12.36 11.29 11.41
Bryanskenergo 0.02 6.23 6.95 6.40 6.17 6.24
Voronezhenergo 0.0 10.78 10.34 10.11 9.76 10.68
Kostromaenergo -0.03 14.45 13.33 12.71 12.68 11.27
Kurskenergo -0.30 8.64 14.39 14.12 13.81 13.16
Lipetskenergo -0.23 10.89 13.75 15.92 12.99 12.25
Orelenergo 0.66 12.53 12.68 11.38 10.09 10.11
Smolenskenergo -0.21 14.98 14.14 13.79 14.69 13.43
Tambovenergo -0.31 7.10 8.00 7.97 7.68 9.91
Tverenergo 0.20 19.05 19,99 19.22 17.07 16.46
Yarenergo 0.49 11.63 11.32 12.13 12.20 10.73

Volume of electrical energy transmission services2 broken down by Branches 2017-2021

Graph
bln kW/h Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo 0.0 3.1 1.8 1.7 1.7 1.7
Bryanskenergo 0.0 1.0 1.0 1.0 0.9 0.9
Voronezhenergo 0.0 2.1 2.2 2.2 2.1 2.2
Kostromaenergo 0.0 0.6 0.7 0.6 0.6 0.7
Kurskenergo 0.0 1.4 0.8 0.8 0.8 0.8
Lipetskenergo 0.0 1.8 1.3 1.2 1.2 1.3
Orelenergo 0.0 0.6 0.6 0.6 0.5 0.6
Smolenskenergo 0.0 0.9 1.0 1.0 0.9 1.0
Tambovenergo 0.0 0.7 0.8 0.7 0.7 0.7
Tverenergo 9.1 1.2 1.2 1.2 1.2 1.3
Yarenergo 6.2 1.6 1.7 1.6 1.5 1.6
2 - Taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
High voltage (110 kV и выше) -0.7 46.4 36.0 35.4 34.4 33.0
Medium voltage (35 kV) 0.0 4.0 4.6 4.4 4.4 4.1
Medium voltage (10-6 kV) 0.1 19.3 23.3 23.7 24.2 24.2
Low voltage (0,4 kV) -0.1 8.5 10.0 10.2 10.1 10.3
Population 1 0.6 21.8 26.1 26.3 26.9 28.4
1Taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 1Q 2021

Grid Connection

Grid connection in 2017-2021

Graph
Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Connected capacity, MW 6.6 208.3 151.4 107.1 419.3 173,2
Number of concluded contracts, pcs. -8.4 8 337 7 758 7 099 6 933 8 915
Number of connections, pcs. -1.0 7 783 7 458 5 870 6 945 7 218
including connections up to 15 kW, pcs. -1.7 7 369 7 011 5 489 6 356 6 664
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days - 130 76 97 66 62

Connected capacity broken down by Branches in 2017-2021

Graph
MW Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo 6.9 34.9 32.3 18.9 24.2 28.1
Bryanskenergo -24.4 3.2 7.1 2.8 18.3 10.2
Voronezhenergo -45.4 40.1 18.6 9.7 282.5 24.9
Kostromaenergo 31.5 11.6 13.5 10.6 14.2 9.6
Kurskenergo 23.6 6.9 7.8 7.4 6.7 3.4
Lipetskenergo 10.3 42.8 12.9 6.4 6.1 11.4
Orelenergo -36.0 6.7 11.7 7.7 7.2 6.8
Smolenskenergo 55.5 15.2 11.0 10.6 19.6 25.6
Tambovenergo 15.4 17.8 4.2 6.4 7.7 3.9
Tverenergo 48.2 13.4 15.3 11.9 14.4 16.1
Yarenergo -5.4 15.6 17.0 14.5 18.4 33.1

Number of concluded contracts broken down by Branches in 2017-2021

Graph
pcs. Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo -11.1 1 611 1 162 1 101 1 147 1 528
Bryanskenergo -24.4 248 335 243 220 283
Voronezhenergo -10.8 860 1 006 940 835 1 350
Kostromaenergo -13.4 1 063 802 646 783 664
Kurskenergo -22.8 355 398 315 376 564
Lipetskenergo -16.9 789 642 590 523 685
Orelenergo -31.5 404 545 293 359 312
Smolenskenergo -2.6 707 744 702 592 772
Tambovenergo -8.3 255 247 285 298 289
Tverenergo 20.8 1 093 907 979 896 1 454
Yarenergo 3.3 952 970 1 005 904 1 014

Number of connections broken down by Branches in 2017-2021

Graph
pcs. Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo -4.1 1 351 1 165 1 030 1 074 1 392
Bryanskenergo -9.4 321 260 255 235 371
Voronezhenergo -0.4 1 181 1 053 602 1 028 1 468
Kostromaenergo 32.1 759 954 640 841 524
Kurskenergo -24.0 330 368 283 425 256
Lipetskenergo -37.6 503 473 360 458 792
Orelenergo -11.1 517 508 503 343 307
Smolenskenergo 20.7 742 582 652 531 748
Tambovenergo -18.9 225 231 245 272 110
Tverenergo 31.0 1 002 891 691 855 572
Yarenergo -17.3 852 973 609 883 678

Number of connections up to 15 kW broken down by Branches in 2017-2021

Graph
pcs. Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Belgorodenergo -5.6 1 250 1 039 945 930 1 242
Bryanskenergo -12.0 311 244 242 214 345
Voronezhenergo 0.2 1 127 998 586 971 1 395
Kostromaenergo 34.8 711 903 552 753 466
Kurskenergo -27.3 306 357 271 397 250
Lipetskenergo -38.7 458 422 332 434 758
Orelenergo -10.3 506 501 489 324 297
Smolenskenergo 23.4 699 535 609 460 670
Tambovenergo -19.6 204 221 232 239 78
Tverenergo 32.9 991 862 672 823 526
Yarenergo -24.3 806 929 559 811 637

Connected capacity structure by categories of applicants in 2017-2021

Graph
% Начальное изменение 1Q 2017 1Q 2018 1Q 2019 1Q 2020 1Q 2021
Up to 15 kW -4.0 п.п. 37.6 50.9 56.1 16.8 44.4
From 15 to 150 kW 1.3 п.п. 9.4 17.1 25.4 10.6 25.1
From 150 to 670 kW 3.0 п.п. 13.8 11.6 5.8 2.7 6.7
670 kW and above -0.2 п.п. 39.2 20.4 12.7 69.9 23.8

Connected capacity structure by categories of applicants in 1Q 2021